Rembang, July 26th 2024 – PT Semen Gresik Rembang Factory consistently distributes infrastructure cluster assistance through the Madani Community Forum (FMM) activities in Tegaldowo village, Rembang Regency. The total operational distribution of concrete road construction in Tegaldowo village reached IDR 1.55 billion with a concrete road of 1.51 kilometers whose construction was carried out from 2021 to 2024.
The assistance is one of the various supports Semen Gresik distributed in the infrastructure cluster, participator... Read more